Thursday 28 February 2013

Ducted AC installed

We had our Ducted AC installed today so now the house can be climate controlled, today was hot and the house was nice a cool very quickly. New Wave AC did a good job, very happy with everything.

They did a 3 phase upgrade to the box a few weeks back and we have a 15Hp unit with 4 zones

Will take some pics of the unit we had installed in the next few days

Friday 22 February 2013

Wardrobe fitouts complete

Wardrobe fitouts have been completed, happy with the work but now have to wait for the doors to be fabricated. That will take 3-5 weeks so no moving for at least that long... They will also be putting a mirror into the WIR and the cornice for the other rooms at the same time.

Kids and Guest rooms
Master built in (mirrored the other side)

Thursday 14 February 2013

Driveway completed

Well after the delays for rain we finally have our driveway completed!!!

Looks good and your last minute change from Bushrock to Ashlar Tile worked out and we love the design.

One issue with it is the concreter went all the way to the footpath with the stencil and SHOULD have stopped 600mm shorter and had a plain section.







I have spoken to council and the developer and they say everything will be fine, will find out in a few weeks I guess :)


 

Wednesday 6 February 2013

Opticomm connection - The problem found!!!

Well after a month or so of the equipment on the side of the house yesterday I had someone from the developer come out and confirm that they forgot to run conduit to my house for the fibre required for TV, internet and phone services........

So today they hand dug a trench to the correct pit and put down a conduit, I asked them to leave it open outside my property and I would sort out the connection (they would not actually connect the two pipes)

We had a family dinner at the house while I got to play in the dirt.

Now to call Opticomm about running my fibre!!


Monday 4 February 2013

We have grass WOOOOHOOOOOO!!!!


Well after a few weeks of delays due to rain we FINALLY have grass. We got it from Atlas Turf, Sir Walter $7 per sqm, I decided to be lazy and paid and extra $200 and got them to lay it....

Looks good and can't wait till it takes





Saturday 2 February 2013

Wood flooring install

Well today our entryway flooring FINALLY is in........ YAY

Looks good and now all 100% for the carpet to be done next week